People
"The personnel involved (ACLP) on the project were all professional and creative problem solvers during the course of the entire project."
- Chuck Fields
President, Fields & Associates
Lake Travis Elementary Additions and Renovations - Lake Travis Independent School District
Concrete Construction - Featured Projects
Round Rock Athletic Complex and Stadium, Round Rock, TX
- $18.3 Million
- 11,000 Seat Stadium
- Office/Storage/Meeting Space
- Concession Stands/Ticket Booths/Film Decks/Restrooms
- Built project specific precast yard
- Designed and detailed all precast members
- Cast and erected 712 members
Rutledge Elementary, Leander, TX
- $12.6 Million
- 100,478 Sq. Ft.
- 156 total tiltwall panels
- Self performed concrete - structural slab on grade concrete, structural elevated deck concrete, structrual and architectural thinbrick sandwich tiltwall panels, erection of tiltwall panels, all exterior concrete flatwork, installation of underground sleeves for irrigation and geothermal loop piping, fine grading for sitework
Wiley Middle School, Leander, TX
- $23.3 Million
- 176,000 Sq. Ft.
- Built in only 15 months, this building is about 85% tiltwall and precast and has 299 total tiltwall panels.
- Self performed concrete - Structural slab on grade concrete forming, structural elevated deck concrete forming, structrual and architectural thinbrick sandwich tiltwall panels, erection of tiltwall panels, all exterior concrete flatwork, installation of underground sleeves for irrigation and geothermal loop piping, fine grading for sitework, water quality pond structure
Callison Elementary, Round Rock, TX
- $19 Million
- 105,168 Sq. Ft.
- 111 tiltwall panels
Rouse High School, Leander TX
- $65 Million
- 400,000 Sq. Ft.
- 673 tiltwall panels
We have completed many projects where we performed the concrete work; below are just a few representative examples. If you would like any additional information on the following projects, please
contact us.
| Sit RODI/IWN Foundations & Building @ FAB25 |
Winkley Elementary |
| Sitework Improvements @ Lakeline Mall |
Wiley Middle School |
| Pedestrian Bridge @ FAB25 Project |
Rutledge Elementary |
| Drilled Piers & Retaining Wall Austin Convention Center |
Round Rock Stadium |
| The Forum Retirement Center (found./conc.) |
Plain Elementary |